Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Shandong Linqu Chenyang Drying Equipment Factory

Wood high frequency vacuum dryer, mahogany high frequency vacuum drying box, ...

sell
  • There is no classification
contact
  • Contact:陈经理
  • Phone:0536-3122379
search
 
link
  • There is no link yet
home > sell > Precautions for installing high-frequency wood vacuum dryer
Precautions for installing high-frequency wood vacuum dryer
products: Views:7Precautions for installing high-frequency wood vacuum dryer 
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-09-21 14:51
 
Details
Precautions for the installation of wood high-frequency vacuum dryer: The first is the foundation acceptance, which mainly checks the foundation concrete pouring quality and size and position deviation. In terms of appearance, the foundation surface is required to be clean and free of oil stains, dust, debris, exposed steel bars, cracks and missing corners, residual shell plates in expected holes, and other pouring defects. The basic size and position deviation should meet the following requirements: the vertical and horizontal axis errors of the outer dimensions and the basic coordinate position are less than. The elevation errors of different planes are less than, only negative is allowed and no positive is allowed; the slope error is less than the total length of the discharge end and is not allowed to be positive; upper The flatness of the plane is less than / the overall length is less than.
Secondly, the wood high-frequency vacuum dryer acceptance is checked against the equipment packing list provided by the wood high-frequency vacuum dryer manufacturer, and the parts, components, standard parts, random documents, etc. are checked to see if there are any wrong parts. , deformation, damage, etc. and keep records for purchase or preparation before installation. Remove the protective coating applied during packaging as well as dust, oil, rust, etc. Check and repair the damage and deformation caused during transportation, loading and unloading. Pre-test and pre-assemble components and key fittings to avoid rework during installation and ensure installation progress and quality.
The third step is to compile the installation process, including basic installation procedures, basic installation procedures, installation process methods and safety technical requirements. Then set the pad to determine the reasonable layout of the pad. Note that the pad should be as close to the anchor bolts as possible and placed at the center of gravity of the load to prevent uneven stress on the pad. The number of pads in each group should not exceed one. Place thicker pads on top and thin ones in the middle. Place them neatly and in good contact. When adjustments cannot completely overlap, the contact area should be greater than %. The bottom pad and the foundation should have sufficient contact accuracy so that the foundation is in dense contact and placed stably without any loose angles. It is also ensured that the up and down pads have the same vertical slope as the foundation and are basically level in the transverse direction. The machine base marking uses an optical theodolite, a laser collimator or a less precise wire drawing method to perform horizontal leveling and longitudinal inclination of the supporting wheel base several times until the coordinate position, transverse level and longitudinal inclination meet the requirements.
Shandong Linqu Chenyang Drying Equipment Factory is a drying equipment manufacturer mainly engaged in mahogany high-frequency vacuum drying boxes, wood high-frequency vacuum dryers, mahogany vacuum wax injection equipment!
Request for quotation
A total of0articles  Related Comments: